Replacing the Tunnel Fans for CPR Case Study

When CPR needed to replace the exhaust fans in the Mount Shaughnessy Tunnel they knew they needed a unique solution to a unique problem and the Eagle West Rail Services Division was there to provide it.

In total, eight fans needed to be removed and replaced and 12 new fans installed. Eagle West formed a unique set of lifting solutions to lower and remove the old fans down from the tunnel ceiling and then transfer them out of the tunnel in a special fan cradle. Then the new fans were brought into the tunnel and installed using the same cradle and hoisting systems.

Eagle West Rail Services worked from 2am to 10am to accomplish this in record time while working with the railroads schedule.