
Fort Macleod, Alberta
Provided Crane Service to install 47 GE 1.5MW units on 67M towers. The nacelle weight was 116,00lbs.
Eagle West provides a single solution to all your wind turbine installation needs

Provided Crane Service to install 47 GE 1.5MW units on 67M towers. The nacelle weight was 116,00lbs.