Industries We Serve

HVAC


HVAC Crane Services

At Eagle West Crane & Rigging, we hoist HVAC units onto BC rooftops, into mechanical rooms, and off old equipment pads, using mobile cranes matched to the job and operators who plan every lift before the truck leaves the yard. Whether we’re pulling a spent rooftop unit, staging new equipment for an upcoming install, or delivering and hoisting directly to the curb, our team has the fleet and the experience to keep an HVAC project on schedule. Call us at 1-800-667-2215 to talk through your next lift.

Contact Us

image_inner

Let's connect about your upcoming project

Request a Quote

SNAPSHOT



snap_img

Dependable

We strive to safely finish each project on time, every time.

snap_img

Expert Operators

Our operators bring hundreds of hours of experience and expertise to support your next project.

snap_img

Safety First

Our organization puts safety first and is committed to providing an Injury & Incident-Free® workplace. Learn about our commitment to safety.

Why BC Contractors Choose Us for HVAC Lifts

HVAC work runs on tight windows. Mechanical contractors need equipment on the roof or in the mechanical room when the schedule says so, not whenever a crane happens to be free, because every hour a building sits without conditioning or ventilation is an hour the rest of the trades are waiting too. We build our HVAC lifts around that reality: get the unit set safely, get it set fast, and get out of the way of the crew waiting to tie it in.

Our fleet is the reason we can say yes to most HVAC configurations. We run all-terrain hydraulic cranes, stiff boom cranes, and crawler cranes, and we pick the unit for the site rather than forcing the site to fit one type of crane. A downtown rooftop with limited street access calls for a different setup than a suburban mechanical room with soft ground on the approach and matching the crane to those conditions is where a lift plan earns its keep. Our lift planning covers load calculations, structural analysis, and ground bearing and wind speed assessments before we ever mobilize equipment, so the crew on site isn’t discovering a problem mid-lift.

HVAC Unit Management and Storage

Not every HVAC unit goes straight from the truck to the curb. When a project calls for equipment to arrive ahead of the install window, or when an old unit comes down before the replacement is ready, we store it. Our covered storage area keeps HVAC inventory out of the weather and off a contractor’s own site, which matters most on projects where laydown space is already tight.

Our dispatch team coordinates the whole cycle: receiving units from the manufacturer or supplier, logging them into covered storage, and shipping them out to the job site on the day they’re needed, not before and not after. Units can sit with us for as long as the schedule requires, whether that’s a few days while a roof curb gets finished or longer while a project works through permitting. When the site is ready, we schedule the crane and the delivery together, so the unit goes from storage to final position in one coordinated move, rather than sitting on a truck waiting for the rest of the job to catch up.

HVAC Unit Hoisting

We hoist HVAC units onto a roof by sending a stiff boom, all-terrain, or crawler crane, matched to the building height and setup space, to lift the unit directly from the truck to the roof curb in a single, planned pick.

The process starts before the crane arrives. We visit the site, confirm the crane’s boom length and reach against the building’s height and any obstructions such as power lines, and check the ground the crane will sit on for bearing capacity, since a crane parked on soft or uneven ground is a bigger risk than the lift itself. From there we plan the pick path, the rigging points on the unit, and the exact spot the unit needs to land on the curb, so the operator and the ground crew both know the plan before the load leaves the ground.

High-rise rooftops and low-rise mechanical rooms call for different approaches. A high-rise lift usually means a longer boom set up further back from the building, working around parapets, rooftop equipment, and overhead lines. A mechanical room install, by contrast, often means threading a unit through a smaller opening or setting it down with less clearance to work with, which puts more weight on precise rigging than on boom length. We plan for whichever version the job requires, rather than running every HVAC lift the same way.

Frequently Asked Questions

Do you offer storage for HVAC units before installation?

Yes. We store HVAC units in a covered storage area for as long as a project needs, and our dispatch team coordinates receiving, storing, and shipping the units to your site when you’re ready for them.

Can your cranes reach HVAC units onto high-rise rooftops?

Yes. We run stiff boom, all-terrain, and crawler cranes with the boom length to reach high-rise rooftops, and our lift planning confirms reach, ground bearing, and wind conditions before we mobilize.

How do you hoist HVAC units into a tight mechanical room?

We plan the rigging points and pick path around the room’s access and clearance, prioritizing precise placement over speed so the unit lands exactly where it needs to sit.

What certifications do your crane operators hold?

Our operators carry Red Seal certification and BC Crane Safe credentials, and our team is COR certified, so every HVAC lift runs to a recognized safety standard.

Do you handle permits and site coordination for HVAC lifts?

Yes. We coordinate permits and safety clearances alongside our onsite project management, so the crane, the rigging, and the paperwork are all lined up before lift day.

How far in advance should we book a crane for an HVAC swap?

Book as early as your schedule allows, especially for rooftop work where boom length and street access need to be confirmed. We offer a free site visit and estimate so we can plan around your building before booking day.

Can you also remove and transport the old unit?

Yes. Our trucking and storage services cover the old unit as well as the new one, so a swap can be a single coordinated move instead of two separate jobs.

Request Quote