Wind Energy
Wind Energy Crane Services
Wind farm builds do not leave room for guesswork. Towers run tall, nacelles run heavy, and blades run long, and every one of those components has to land exactly where the engineering says it should. We have been solving that problem in British Columbia since 1990, and wind energy has been part of our crane and rigging work for most of that time.
Our track record of completed projects and satisfied customers is why clients bring us their wind farm work first. We have the equipment, the certified crews, and the lift planning experience to get a turbine erected safely and on schedule, from the first site visit to the final tie-in. To have us quote your next project, give us a call at 1-800-667-2215.
Contact Us
Let's connect about your upcoming project
Request a QuoteSNAPSHOT
Dependable
We strive to safely finish each project on time, every time.
Expert Operators
Our operators bring hundreds of hours of experience and expertise to support your next project.
Safety First
Our organization puts safety first and is committed to providing an Injury & Incident-Free® workplace. Learn about our commitment to safety.
Cranes Built for Wind Farm Ground Conditions
Wind farm sites rarely offer flat, compacted ground. Turbine pads sit on ridgelines, soft agricultural fields, or remote gravel access roads, and the crane has to hold its position through the full lift regardless. That is why our crawler crane fleet does most of the heavy work on wind projects. A crawler’s tracked undercarriage spreads load across a wider footprint than a wheeled crane, which matters when the pad cannot be built to the same standard as a paved lay-down yard.
We size the crane to the lift, not the other way around. A tower section, a nacelle, and a blade all impose different loads at different radii, so each stage of a turbine erection may call for a different rigging plan even on the same machine. Our lift planning and engineering team runs the load calculations, structural analysis, and ground bearing assessments before the crane ever mobilizes, and we factor in wind speed limits for the day of the lift, since blade and nacelle picks are among the most wind-sensitive lifts in any industry.
What Size Crane Is Needed for Wind Turbine Installation?
The short answer: a high-capacity crawler crane, typically in the several-hundred-tonne class, sized to the specific nacelle weight and hub height rather than a single standard rating. Nacelle picks carry most of the tonnage, but the crane’s rated capacity at that lift’s radius and boom length has to clear the nacelle weight by a wide margin because of the bending moment created by height and reach. Blade and tower section lifts call for their own boom configuration and, on longer blades, a tandem lift with a second crane to control the tip while the main crane sets the root. We work through this sizing exercise with you during lift planning so the crane on site matches the turbine model, not a generic estimate.
Lift Planning for Nacelles, Blades, and Tower Sections
Each turbine component brings its own handling problem:
- Tower sections are cylindrical, tall, and awkward to rig without marring the finish, so we plan pick points and tag line positions before the section leaves the truck.
- Nacelles carry the highest single-lift weight on the turbine and demand the most conservative capacity margin, since a nacelle pick at full boom height leaves little room for error in wind or ground movement.
- Blades are long enough to behave like a sail in moderate wind, which is why longer blades often move with two cranes working in tandem rather than one crane alone.
We plan the erection sequence turbine by turbine, factoring in access road width, staging area size, and how far the crane has to travel between pads, so the crew is not solving these problems for the first time on site.
Turbine Manufacturers We Have Worked With
To date, we have been involved in the installation and transportation of hundreds of wind turbines from a range of suppliers, including Nordex, Vestas, NEG Micon, GE, and Enercon. Each manufacturer specifies its own lift procedures and tolerances, and our crews come to site already familiar with those differences rather than learning them mid-project.
Certified Crews and Project Management
Every operator we send to a wind farm holds Red Seal certification and BC Crane Safe credentials, and our teams work under COR certified safety standards. As your job moves forward with us, we assign an experienced, full-time project manager to your site so that permits, logistics, and daily lift sequencing stay coordinated in one place instead of being split across multiple contacts.
Trucking and storage for turbine components are part of the same one-stop-shop relationship, so equipment does not sit waiting on a separate hauler’s schedule. If your project needs more than a crane on site, that coordination is already built into how we run a wind farm job.
Frequently Asked Questions
Which turbine manufacturers have you worked with?
We have handled installation and transport for turbines from Nordex, Vestas, NEG Micon, GE, and Enercon, among others. Our crews plan around each manufacturer’s specific lift procedures rather than treating every nacelle the same.
What size crane do you use for wind turbine installation?
Most nacelle and tower erection work on a wind farm calls for a high-capacity crawler crane, sized to the specific turbine’s weight, hub height, and lift radius. We confirm the exact configuration during lift planning rather than quoting a single standard size.
Why use a crawler crane instead of a mobile crane on a wind farm?
Crawler cranes spread their load across a wider tracked footprint, which holds up better on the soft or uneven ground common at turbine pads. That stability matters most during the highest, heaviest picks of the erection sequence.
How do you handle blade lifts in windy conditions?
Blades are long enough to act like a sail, so we set wind speed limits for every lift and hold picks when conditions exceed them. Longer blades are often set using a tandem lift, with a second crane controlling the tip while the main crane sets the root.
Do you handle the ground bearing assessment for turbine pads?
Yes. Our lift planning and engineering team runs ground bearing assessments alongside the load calculations and structural analysis before a crane mobilizes to a pad.
Do you provide project management for wind farm builds?
Yes. We assign a full-time project manager to coordinate permits, logistics, and lift sequencing across the life of the project, so your site has one point of contact instead of several.

